Alila Soori

Project details

  • Client

    SCDA Architects

  • Services

    Cost Management & Quantity Surveying

  • Location

    Tabanan, Bali, Indonesia

  • Sectors

    Hotels & Entertainment

WT Partnership provided Quantity Surveying services for Alila Soori, a luxury five-star resort development designed by internationally acclaimed SCDA Architects and constructed by Nusa Raya Cipta. Completed in 2009 on Bali’s south-west coast in Tabanan, the resort was conceived as an exclusive beachfront retreat that seamlessly integrates contemporary Asian architecture with the island’s natural landscape of rice fields, volcanic mountains and black-sand beaches.

The development comprises 45 luxury villas together with premium resort facilities set within a carefully planned coastal environment. Designed by SCDA Architects, the project emphasises privacy, tranquillity and a strong connection to nature, with buildings arranged to maximise views of the Indian Ocean, surrounding rice terraces and tropical landscapes. Water courts, landscaped gardens and open-air spaces were incorporated throughout the resort to create a seamless transition between indoor and outdoor environments.

Recognised internationally for its architectural quality, the resort is widely regarded as one of Bali’s landmark luxury hospitality developments. The design combines contemporary elegance with sustainable site planning, local materials and landscape-sensitive architecture, creating a destination that reflects both the cultural heritage and natural beauty of Bali.